Location:
Watkins, CO
Owner:
FRA Investors LLC
Architect
Jehn Engineering
Size:
28,800 Square Feet
Construction Value:
$1-5 Million
Completion Date:
March 2007
Watkins, CO
Owner:
FRA Investors LLC
Architect
Jehn Engineering
Size:
28,800 Square Feet
Construction Value:
$1-5 Million
Completion Date:
March 2007
H5195 Hangar

H5195 is located at Front Range Airport, Colorado. The H5195 Hangar, concrete aircraft apron and double row car parking is accessed by a service road adjacent to the main airport entrance road (Front Range Parkway). Module #2 provides all facilities expected in a corporate, hangar environment. The Hangar measures 160 ft wide with a depth of 180 ft. The electrically operated, bi-parting rolling doors provide a clear opening of 116 ft wide and 28 ft high, giving access for all FAA Group 2 aircraft and some Group 3 aircraft up to Gulfstream V size and larger. The hangar floor slab and aircraft apron are 7.5" thick, reinforced concrete.
Highlight image to enlarge.